Our DC facility in Atlanta features 75,000 square foot, SAS 70 Type II-certified
data center in Atlanta, Georgia serves as its home base. Wholly owned and
managed, the Atlanta facility serves as a staple to high-level, 24/7/365
security. With no single point of network failure,
Electrical
- Multiple utility power feeds
- Two 'A' feed (primary) UPSs | One 3-module (N+1) 750 kVA unit | One 4-module (N+1) 2000 kVA unit
- One 'B' feed (redundant) UPS 1 module 750 kVA unit
- Ten 500 kW diesel-powered generators (N+1 capacity), controlled by dual PSSI static switchgear units
- On-site fuel storage tank
- Redundant cooling towers
- Multiple pumps (N+1) to circulate water to CRAC units
- Multiple CRAC units setup in a zone configuration
- 36,000 gallon storage tank to hold make-up water for cooling towers
- Private well to supply make-up water (well is backed up by city water)
Facility
- 27,000+ sq ft of non-raised floor data center space
- 25,000+ sq ft of raised floor data center space
- Secured facility with 24x7 video monitoring and armed security
- 24x7x365 on-site technical staff
- Secured access to facility (controlled by a combination of proximity cards and biometric hand scanners)
- Six utility feeds from the Dallas Central Business District power grid, featuring reliable N+3 transformers with ATS switches, plus secure, concrete encased building feeds.
- UPS and Generator Backup Power using true A+B power configurations.
- All UPS and Generator deployments provide N+1 redundancy provided by:
- Two 1200 KVA CAT UPS Systems
- Four 2.0 megawatt generatorss
- Three 1.5 megawatt generators
- Advanced security maintained through:
- On site security, 24/7/365
- Card access required to enter parking and building lobby
- Biometric hand scanner required for datacenter entry
- Annual SAS 70 Audits
- Consistent and precise HVAC Cooling System designed with N+1 redundancy and
featuring:
- 3500 Ton cooling tower capacity
- 80,000 gallon reserve make-up water tank
- Liebert Leak Detect System
- Raised flooring
This facility is protected by over 100
cameras which are connected to a digital time-lapse recording system. In
addition to the cameras, the building requires digital key-card entry at every
door. To gain access to the data-center itself, you must swipe a keycard at
three doors.
Physical security into any Sago Networks facility is several levels. All
employees, customers and contractors are restricted to the necessary levels of
access determined by job function and service. All customers are required to
provide a government issued ID card/driver's license to place on file before
being allowed into the facility.
Any persons not identified with a company prior to coming to a Sago Networks
facility will be asked to provide identification and Sago Networks will contact
the person of authorization for the account before access is granted. Customer's
entering the facility are required to sign in with network operations center
personnel and will be let into the facility by a network operations center
employee.